All Products
-
Huawei TelecomYes,we always purchase the Tote Cart and work table. This is the fast and warm service company. -
Geely MotorsNice service,good price,easy adjusted style,better quality. -
Thinh-VietnamHi,johnson,please arrange 12000 meters 2808 lean tube,ivory color.
DY11 Industrial OD 28mm Cylindrical Profile Aluminium Lean pipe /Tube for Workshop
| Standard: | GB, GB/T 9711.2-1999 |
|---|---|
| Material: | Aluminum |
| Thickness: | 1.7mm |
Stainless Steel cold rolled steel tube Industrial Equipment Materials For ESD Workbench
| Standard: | GB, GB/T 9711.2-1999 |
|---|---|
| Material: | Steel And Iron |
| Surface: | Plastic Coated |
28mm Round / Square Lean Tube Aluminium Alloy Lean Pipe Joint Automated Assembly System
| Section Shape: | Round |
|---|---|
| Surface Treatment: | Chroming |
| Tolerance: | ±1% |
4m Lean Pipe Industrialization Unilateral Material Box Aluminum Alloy
| Type: | Parallel Connector |
|---|---|
| Material: | Aluminum |
| Surface Finish: | Sand Blasting |
Building Structures 2020 Alum Extrusion Shapes 4 Slots V Slot
| Type: | Parallel Connector |
|---|---|
| Material: | Aluminum |
| Surface Finish: | Sand Blasting |
Automation Modular System 40x40mm T Slot Profile Aluminium Extrusion 4040
| Type: | Parallel Connector |
|---|---|
| Material: | Aluminum |
| Surface Finish: | Sand Blasting |
Industrialization T Type Aluminum Alloy Lean Pipe
| Type: | Parallel Connector |
|---|---|
| Material: | Aluminum |
| Surface Finish: | Sand Blasting |
T Shape Aluminum Lean Pipe DY43-02A Tube For Warehouse Trolley Cart
| Packaging Details: | 10pcs are bundled together in one piece with woven bag, and the two ends are wrapped with film protection. |
|---|---|
| Delivery Time: | 12-18 work days |
| Payment Terms: | L/C, T/T |
Aluminum Lean Pipe DY43-01A Tube For Warehouse Trolley Cart
| Packaging Details: | 10pcs are bundled together in one piece with woven bag, and the two ends are wrapped with film protection. |
|---|---|
| Delivery Time: | 12-18 work days |
| Payment Terms: | L/C, T/T |
Lean Pipe Aluminum Lean Tube For Warehouse Trolley Cart
| Packaging Details: | 10pcs are bundled together in one piece with woven bag, and the two ends are wrapped with film protection. |
|---|---|
| Delivery Time: | 12-18 work days |
| : |

