All Products
-
Huawei TelecomYes,we always purchase the Tote Cart and work table. This is the fast and warm service company.
-
Geely MotorsNice service,good price,easy adjusted style,better quality.
-
Thinh-VietnamHi,johnson,please arrange 12000 meters 2808 lean tube,ivory color.
Contact Person :
Xavier Wu
Phone Number :
86-15757861864
Whatsapp :
+8615757861864
28mm Round / Square Lean Tube Aluminium Alloy Lean Pipe Joint Automated Assembly System
Section Shape: | Round |
---|---|
Surface Treatment: | Chroming |
Tolerance: | ±1% |
4m Lean Pipe Industrialization Unilateral Material Box Aluminum Alloy
Type: | Parallel Connector |
---|---|
Material: | Aluminum |
Surface Finish: | Sand Blasting |
Building Structures 2020 Alum Extrusion Shapes 4 Slots V Slot
Type: | Parallel Connector |
---|---|
Material: | Aluminum |
Surface Finish: | Sand Blasting |
Automation Modular System 40x40mm T Slot Profile Aluminium Extrusion 4040
Type: | Parallel Connector |
---|---|
Material: | Aluminum |
Surface Finish: | Sand Blasting |
Industrialization T Type Aluminum Alloy Lean Pipe
Type: | Parallel Connector |
---|---|
Material: | Aluminum |
Surface Finish: | Sand Blasting |
T Shape Aluminum Lean Pipe DY43-02A Tube For Warehouse Trolley Cart
Packaging Details: | 10pcs are bundled together in one piece with woven bag, and the two ends are wrapped with film protection. |
---|---|
Delivery Time: | 12-18 work days |
Payment Terms: | L/C, T/T |
Aluminum Lean Pipe DY43-01A Tube For Warehouse Trolley Cart
Packaging Details: | 10pcs are bundled together in one piece with woven bag, and the two ends are wrapped with film protection. |
---|---|
Delivery Time: | 12-18 work days |
Payment Terms: | L/C, T/T |
Lean Pipe Aluminum Lean Tube For Warehouse Trolley Cart
Packaging Details: | 10pcs are bundled together in one piece with woven bag, and the two ends are wrapped with film protection. |
---|---|
Delivery Time: | 12-18 work days |
: |
High Quality Aluminium Lean Pipe Flexible Pipe Metal Tube For Factory Workbench
Packaging Details: | 10pcs are bundled together in one piece with woven bag, and the two ends are wrapped with film protection. |
---|---|
Delivery Time: | 12-18 work days |
: |
Strong Structure Aluminum Lean Pipe Profile For Rack And Karakuri System
Place Of Origin: | ZheJiang China |
---|---|
Delivery Time: | 12-15 Days |
Shape: | Round |